Sunday was a big work day for Chris (I helped a little too!) He tiled the tub up to the decorative pieces. We originally were going to build shelves that were set back into the back wall. Because of the way the studs were laid we couldn't do that without having a potential water problem. So now we're on to plan B. I have to go out to the tile store today to see if they have a corner shelf that we can install above the decorative tiles. After we get that the rest of the tub area can be finished.
Fun Times!
5 years ago
2 comments:
Its starting to look really good, I almost can't remember what the old room looked like
Yeah, I can't wait to see the "final product!"
Post a Comment