Little Hiccup

Last week Chris received a call while at work that construction was ordered stopped on our house because of the roof pitch over the third car stall on the garage. Our construction manager quickly fixed the problem so construction could resume. If you look closely, you can see the original roof truss which was at a 4:12 pitch. They built the trusses up ever so slightly so it is now a 6:12 pitch. We also lost a window on that side of the house now that was on site ready to be installed. You can see where that opening was on the right side of the roof. There's a different wrapping over where the window hole was. Those seemingly minor things carry a nice price tag. We are just glad it's fixed and construction is moving again!